Projects in the DR

JD Jones

Moderator:North Coast,Santo Domingo,SW Coast,Covid
Jan 7, 2016
12,154
8,509
113
And today they've announced a public tender for line 3 of the Santo Domingo Cable Car system. From km 12 on the 30 de Mayo to Km 9 of the Autopista Duarte, going through Ave. 27 Feb at Luperon where they are going to install another tunnel to ease traffic congestion at the Plaza de la Bandera in Pinturas (27 with Isabela Aguiar)

GOlsDjCW8AAmgoe


But, that's not all. This is part of a transportation system that will include a North/South tramway on Churchill

The Santo Domingo Integrated Transportation System (SIT-SD) also includes the Santo Domingo metropolitan train, the Santo Domingo tram, the San Cristóbal train and the incorporation of urban interchanges, as well as the construction of three urban bus terminals. .

 
Last edited:
  • Like
Reactions: colmcb and aarhus