And today they've announced a public tender for line 3 of the Santo Domingo Cable Car system. From km 12 on the 30 de Mayo to Km 9 of the Autopista Duarte, going through Ave. 27 Feb at Luperon where they are going to install another tunnel to ease traffic congestion at the Plaza de la Bandera in Pinturas (27 with Isabela Aguiar)
But, that's not all. This is part of a transportation system that will include a North/South tramway on Churchill
The
Santo Domingo Integrated Transportation System (SIT-SD) also includes the Santo Domingo metropolitan train, the Santo Domingo tram, the San Cristóbal train and the incorporation of urban interchanges, as well as the construction of three urban bus terminals. .
Este proyecto contempla un intercambiador en túnel en la Av. Winston Churchill para el paso del tranvía y carriles de tráfico, reduciendo de manera considerable la congestión vehicular en el centro de la ciudad.
noticiassin.com